Located in Sanur’s sought-after beachside area, this modern three-bedroom villa offers comfortable tropical living just five minutes from Sanur Beach. Set on 300 sqm of land, the property combines a convenient coastal location with contemporary design, private outdoor space, and easy access to Sanur’s restaurants, shops, and everyday amenities.
Scheduled for completion in Q1 2027, the two-storey villa provides approximately 164 sqm of building space with three bedrooms and three bathrooms. A private swimming pool, enclosed garden, and fully furnished interiors make the property suitable as a private residence or holiday home, with a flexible installment plan available during construction.
Property Highlights
Price: IDR 8,000,000,000
Title: Leasehold
Lease Period: 30 Years
Completion Date: Q1 2027
Location: Sanur, Bali
Land Size: 300 sqm
Building Size: Approximately 164 sqm
First Floor: 82.91 sqm, excluding terrace
Second Floor: 81.24 sqm, excluding balcony
Building Levels: 2
Bedrooms: 3
Bathrooms: 3
Furnishing: Fully Furnished
Swimming Pool: Private Swimming Pool
Garden: Private Enclosed Garden
Parking: Yes
Zoning: Pink Zone – Tourism Accommodation
Handover: Q1 2027
Location & Surroundings
Positioned on the beachside of Sanur, the villa offers convenient access to the coastline as well as the area’s dining, shopping, and lifestyle destinations.
- Approximately 5 minutes to Sanur Beach
- Approximately 10 minutes to ICON Bali
- Approximately 10 minutes to GrandLucky Sanur
- Approximately 15 minutes to Bali International School
- Approximately 25 minutes to Ngurah Rai International Airport
Travel times are approximate and may vary depending on traffic.
Why This Property Stands Out
- Prime beachside location in Sanur
- Only approximately 5 minutes from the beach
- Generous 300 sqm land for a 3-bedroom residence
- Private swimming pool and enclosed garden
- Fully furnished upon completion
- Pink tourism accommodation zoning
- Modern two-storey layout with terrace and balcony areas
- Flexible installment plan during the construction period
- Scheduled handover in Q1 2027
Get in touch with us for more information or to arrange a viewing.























